About this document
This document explains how to install the Passport 8250 device.
This document uses the terms DS-1/E1 and STM-1/OC-3. The term DS-1/E1
is for information that applies to both DS-1 and E1 interfaces. The term
STM-1/OC-3 is for information that applies to both STM-1 and OC-3 ports.
When information is for a specific interface or port, the individual designation
is given.
Who should read this guide
You should read this document if you are responsible for performing the
following tasks:
•
•
What you need to know
You need to know the following information:
•
•
How this guide is organized
This guide is divided into the following sections:
•
•
•
•
Installing the Passport 8250 device.
Replacing hardware components.
ATM networking principles.
Electrical and physical safety procedures and standards.
"Passport 8250" (page 15).
"Preparing for the hardware installation" (page 21).
"Installing the Passport 8250 device" (page 25).
"Configuring the Passport 8250 for operations" (page 37).
Passport 8250 Installation Guide R2.2
11