6.6 Installation
6.6.1

Filling the water circuit

The appliance undertakes automatic filling of the water supply
circuit.
The sequence:
Machine starting up.

First self installation mode.

At the first machine start up will be performed a self installtion.
At first machine start-up, the system will perform an auto-instal-
lation run that will also fill-up the espresso boiler with 300cc.
- At the end of said auto-installation and fill-up, the system will
request entry of the date.
– at the end of the water filling (Fig.6.13), effect a cleaning cycle
of the mixer group so as to fill all the circuits and remove even-
tual residues from the boiler.
First self installation mode
For Espresso single boiler:
When the distributor is started up the airbreak is filled with wa-
ter.
When the floater is in the upper position the machine will start
loading water automatically and this will go on until 300cc of water
are counted by the fan (coffee will therefore be dispensed via the
coffee electro valve).
The procedure will be carried out with resistance off.
At the end a date will be shown on the display.
For Instant boiler :
Upon switching on of the dispenser, the polysulfone boiler starts
filling up until it reaches the probe's maximum level.
The pump starts up for 5 sec, the system requests entry of the
date, then the heat-up process begins.
Before connecting up the machine's power supply, check
to ensure that you have connected the dispenser up to
the water supply mains and that you have opened the
water supply tap.
Perform the first installation procedure for VMs with self-
feeding tank, by removing the filter, if present, from the
tank itself.