Lifting Outboard - Mercury 75 Pro XS FourStroke Operation Maintenance Installation Warranty Manual

Table of Contents

Advertisement

OUTBOARD INSTALLATION
Transom Drilling Fixture
2. Drill four 13.5 mm (17/32 in.) mounting holes.

Lifting Outboard

1. Remove the top cowl.
2. Install the lifting base to the flywheel using three bolts. Tighten the bolts
securely.
3. Thread the lifting eye into the lifting base.
4. Connect a hoist that has a minimum lift capacity of 450 kg (1000 lb) to the
lifting eye.
eng
5489
109
91‑98234A2
Aids in engine installation by acting as a
template for engine mounting holes.
3973

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents