Power Nozzle Light Bulb; Power Nozzle Motor - Panasonic MC-CL935-00 Service Manual

Table of Contents

Advertisement

2.6.

Power Nozzle Light Bulb

2.6.1.
Bulb Removal
1. Remove Power Nozzle cover (see Nozzle Cover -
Removal).
2. Remove bulb by pulling straight out.
2.6.2.
Bulb Reinstallation
1. To replace bulb cafeully push fully into slot. Use bulbs
only rated 13V AC (9W).
2. Reinstall Power Nozzle cover (see Nozzle Cover -
Replacement).
.
2.7.

Power Nozzle Motor

2.7.1.
Specifications
1. 120V., 60Hz.
2. Amps 2.0/2.7 (max.) at 18,000/14,550 R.P.M.
3. Watts 225/298 (max.) at 18,000/14,550 R.P.M.
4. Torque 55/100 Nm at 18,000/14,550 R.P.M.
2.7.2.
Removal
1. Remove nozzle cover and agitator assembly (See Nozzle
Cover and Belt & Agitator).
2. Remove two (2) motor bracket screws. Lift out bracket
and motor.
NOTE: Observe routing of motor wires and all other wiring
before removing motor.
3. Remove two (2) motor bracket screws. Lift out bracket
and motor.
4. Remove the overload protector wire terminals. Check
continuity by depressing the button completely. When the
button is released there should be continuity between the
two poles when checked. If all components and items in
the troubleshooting guide have been checked and the
overload protector continues to trip, it should be replaced.
5. Insert a flat screwdriver blade between the indicator block
assembly and the plastic retainer for the four (4) wires.
Pry up and out to free the indicator block assembly from
the retaining tabs.
2.7.3.
Reinstallation
1. Install new motor.
CAUTION: Do not pinch wires.
2. Install motor bracket and secure with two (2) screws.
3. Reroute all wiring per original layout utilizing wire
retainers provided, and proper placement of wires to
prevent pinching of wires and interference when
reinstalling the indicator block assembly. Connect wires
and apply wire nuts, (reference WIRIING DIAGRAM and
WIRE MANAGEMENT).
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents