Download Print this page

TRENDnet TEW -739APBO Quick Installation Manual page 12

N300 outdoor poe access point

Advertisement

1. Refer to the above diagram.
2. Mount the TEW-739APBOs in your desired location. Instructions for pole mounting the access
point can be found in the section.
3. Verify that the status LED indicators on both TEW-739APBOs are fully functional: PWR
[Power](Green / Solid), LAN (Blinking / Green), Wireless Signal Strength (Blinking /
Green).
Wireless Signal Strength
Connecting the Grounding Wire
1. Identify the grounding hole on the outdoor access point. You
2. Align one end of the grounding wire over the hole. Then secure grounding wire with the
provided screw and washer.
3. Connect the green grounding wire to a grounding object.
e.g. Earth driven rod, grounded electrical system.
l see a symbol next to the hole.
11
LAN
Power

Advertisement

loading