4. Power Supply: Pump is designed for 115 V.,
60 Hz., operation and requires a minimum
15 amp individual branch circuit. Both pump and
switch are supplied with 3-wire cord sets with
grounding-type plugs. Switch plug is inserted
directly into outlet and pump plug inserts into
opposite end of switch plug.
Pump should always be
suitable electrical ground such as a grounded
water pipe or a properly grounded metallic
raceway, or ground wire system. Do not cut off
round ground pin.
5. If pump discharge line is exposed to outside sub-
freezing atmosphere, portion of line exposed
must be installed so any water remaining in pipe
will drain to the outfall by gravity. Failure to do
this can cause water trapped in discharge to
freeze which could result in damage to pump.
6. After piping, check valve and float switch have
been installed, the unit is ready for operation.
Bracket
Pin
Float
Rod
NOTICE: See instructions included with replacement switch, Part Number FPS17-66.
For parts or assistance, call Flotec Customer Service at
electrically grounded to a
Vertical Switch Replacement
Switch
Housing
Bracket
Mounting
Screws
Rod Stop
7. Check the pump operation by filling sump with
water and observing pump operation through one
complete cycle. For switch settings see the Electrical
and Switch Specifications chart on Page 2.
to improper operation, premature failure, and
flooding.
OPERATION
Risk of electric shock. Do not
handle a pump or pump motor
with wet hands or when standing on wet or damp
surface, or in water.
1. Shaft seal depends on water for lubrication. Do
not operate pump unless it is submerged in
water as seal may be damaged if allowed to
run dry.
2. Motor is equipped with automatic reset thermal
protector. If temperature in motor should rise
unduly, switch will cut off all power before
1
Mount the bracket on the switch
housing.
Slip the float and then the rod stop
2
onto the rod past the nib.
3 Insert the rod assembly up into the
switch housing and lock into place
with the pin.
NOTICE: Be sure the pin holds the
rod in the switch housing or the pump
will not shut off.
4 Attach the switch to the discharge pipe
as shown. The bottom of the bracket should
be 7-1/4" above the top of the volute for
correct on/off points (see below).
7-1/4"
1-800-365-6832
Failure to make this
operational check may lead
4