Bostitch MCN150-E Technical Data Manual page 8

Hide thumbs Also See for MCN150-E:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Loading Nails (Figs 3-7):
1. Hold nailer with magazine tilted downward. Insert stick of nails from rear of magazine (Fig 3). The MCN250-E
has three separate nail channels for 40, 50 and 60 series nails (Figs 4 - 6). Never mix different length nails in
the magazine. Slide nails all the way to the front of magazine.
2. Engaging Pusher: Pull pusher towards rear of magazine beyond the last nail , then release to engage pusher
to the strip of nails (Fig 7).
Removing Nails (Fig 8-12)
1. Depress the pusher tab to disengage pusher from the nails (Fig 8). Slowly slide pusher forwards past the
nails to the nosepiece (Fig 9).
2. Remove nails by releasing the pusher spring and sliding nails backwards (Fig 10).
3. Depress the magazine tab and slide nails past magazine tab and out the magazine. (Fig 11 & 12).
DIRECTIONAL EXHAUST DEFLECTOR (Fig 13)
The adjustable exhaust deflector can be rotated unto any desired position by hand without the use of hands.
CONTACT TRIP HOUSING ASSEMBLY REPLACEMENT (Fig 14 & 15)
Never TAMPER with or disassemble contact trip (CT) housing assembly, it can cause SEVERE injury to the user
or to bystanders. Contact trip housing must be replaced as a COMPLETE ASSEMBLY only.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mcn250-e

Table of Contents