Worcester Greenstar 12Ri Technical Information page 15

Ri series, cdi classic regular series regular gas-fired condensing wall mounted boiler range
Hide thumbs Also See for Greenstar 12Ri:
Table of Contents

Advertisement

Boiler location & clearances
Bathrooms
IMPORTANT:
Any switch or appliance control using mains electricity must
not be within reach of a person using the bath or shower.
Electrical switches, fused spurs and socket outlets must
not be situated in the bathroom.
A boiler fitted with a non-mechanical timer or with no timer
can be installed in zone 2 or outside the shaded area.
2,250mm
2,250mm
1
2
1
2
2
2,250mm
2
2,250mm
600mm radius
600mm radius
A boiler with a mechanical timer or RF mechanical timer
with a room thermostat must only installed outside the
shaded area.
Additional Residual Current Device (RCD) protection may
be required.
Refer to the latest IEE wiring regulations.
6 0 0 m m
6 0 0 m m
2
1
2
1
6 0 0 m m
6 0 0 m m
2
1
1
1
2
1
750mm
750mm
2,250mm
2,250mm
750mm
750mm
2,250mm
2,250mm
15

Advertisement

Table of Contents
loading

Table of Contents