Read the following pages carefully: you will be able to draw useful suggestions regarding the correct use of the appliance, the respect of which, will confirm your satisfaction for the Immergas product.
A partially protected The Victrix 26 2 I boiler has been designed template to fix the appliance to the wall; they only area is one in which the appliance is not for wall mounted installation only;...
The materials used for the central heating circuit to connect to the drainage system by means inert gases (nitrogen) that degrade the mixture of Immergas boilers resist ethylene and propylene of acid condensate resistant pipes having an delivered to the appliance casing functioning glycol based antifreeze liquids (if the mixtures are internal diameter of at least 13 mm.
R8 (present only on Plus and X versions) must be eliminated whenever the Storage tank Unit is connected clamps 41 and 44 on the P.C.B. (in boiler), Electrical connection: The “Victrix 26 2 I” boiler The chrono-thermostat is powered by two 1.5V...
In this configuration the boiler is classified as type of room chrono-thermostat used and can so-called equivalent length, obtained from the type B work in combination with Immergas chrono- ratio between the relative Resistance Factors. With this configuration: thermostats. The correlation between system...
Page 9
Tables of Resistance Factors and Equivalent Lengths. Equivalent Equivalent Equivalent Resistance length in m of concentric length in metres length in metres DUCT TYPE Factor pipe Ø 60/100 of pipe Ø 80 of pipe Ø 60 Concentric pipe Ø 60/100 m 1 Intake m 7.3 Intake and Exhaust m 1.9...
1.9 INDOOR INSTALLATION. • Extensions for horizontal kit (Fig. 1-16). The Note: when the boiler is installed in areas where • Type C configuration, sealed chamber and horizontal intake-exhaust kit Ø 60/100 can very rigid temperatures can be reached, a special fan assisted.
Page 11
Separator kit Ø 80/80. The Ø 80/80 separator • Coupling of extension pipes and elbows. To • Configuration type B open chamber and kit, allows separation of the exhaust flues and install push-fitting extensions with other forced draught. air intake pipes according to the diagram shown elements of the flue extraction elements The appliance can be installed inside buildings in in the figure.
Ø80 flexible “Green Range” ducting systems must front cap and keeping the motor running. Re- length is obtained considering the complete only be used for domestic use and with Immergas tighten the cap after the operation Ø 80 exhaust terminal, 1m of Ø 80 pipe in condensing boilers.
1.17 CIRCULATION PUMP. 1.18 KITS AVAILABLE ON REQUEST. For issue of the Declaration of Conformity The “Victrix 26 2 I” series boilers are supplied • System cut-off valve kits with or without provided for by Italian Law, the following must...
INSTRUCTIONS FOR USE a) drain the heating system if anti-freeze is not - in the event of damage to the cable, switch used; off the appliance and contact exclusively AND MAINTENANCE. qualified staff for replacement; b) shut-off all electrical, water and gas supplies. 2.1 CLEANING AND MAINTENANCE.
To display where the functioning state is shown The Victrix 26 2 I boiler signals any anomalies eliminate “overheating block” the Reset button Important: if the boiler is put into "off "...
A qualified temperature conditions, the boiler blocks. In this Push button control panel anomaly. This occurs technician must be called (e.g. Immergas After- case, after suitable cooling, it is possible to reset when the circuit board detects an anomaly on the Sales Service).
The boiler manometer should read a pressure protected using anti-freeze liquid and installation between 1 and 1.2 bar. of the Immergas Anti-freeze Kit in the boiler. In If the pressure falls below 1 bar (with the circuit the case of prolonged inactivity (second case),...
BOILER - switch the boiler on and ensure correct ignition; - ensure production of domestic hot water; COMMISSIONING (INITIAL - check the Δp gas values in domestic hot water - ensure sealing efficiency of water circuits; and heating modes; CHECK) - check ventilation and/or aeration of the - check the CO in the combustion products at...
N.B.:maintenance interventions must be carried condensate. - calibrate the number of fan revs. (Par. 3.5): out by a qualified technician (e.g. Immergas - Heat exchanger blocked. This may be caused by - adjust the correct air/gas ratio (Par. 3.6); After-Sales Technical Assistance Service).
These adjustments must be made with reference Victrix 26 2 I be carried out with the casing open and removing to the type of gas used, following that given in...
3.8 PROGRAMMING THE P.C.B. The boiler is prepared for possible programming of several operation parameters. By modifying these parameters as described below, the boiler can be adapted according to specific needs. To access the programming phase, position the DHW selector (5) on position “6”, the CH selector (6) on position “9”...
Page 23
Parameter Description Range Default Parameter Establishes the switch-off method in DHW mode. 1 Correlated: the boiler switches off on the basis of the temperature set. DHW thermostat 0 - 2 0 and 2 Fixed: the switch-off temperature is fixed on the maximum value independently from the value set on the control panel.
3.9 SOLAR PANELS COUPLING 3.13 RADIATORS ANTI-FREEZE 3.17 YEARLY APPLIANCE CHECK AND FUNCTION. FUNCTION. MAINTENANCE. The boiler is set-up to receive pre-heated water If the system return water is below 4°C, the boiler The following checks and maintenance should from a system of solar panels up to a maximum starts up until reaching 42°C.
3.18 CASING REMOVAL. To facilitate boiler maintenance the casing can be completely removed as follows: - disassemble the lower plastic protection grid (1) by loosening the two lower screws (2); - loosen the two screws (4) present in the lower part of the casing front (3);...
3.19 VARIABLE HEAT POWER. tenths of mm or Pascal. The power data in the N.B.: the pressures indicated in the table repre- table has been obtained with intake-exhaust pipe sent the differences of pressures at the ends of measuring 0.5 m in length. Gas flow rates refer the Venturi mixer and can be measured from to heating values below a temperature of 15°C the pressure point in the upper part of the sealed...