Unpacking And Inspecting The Parts - Network Instruments GigaStor 114ff User Manual

Enterprise-strength network probe appliance
Table of Contents

Advertisement

Unpacking and inspecting the parts

18

Unpacking and inspecting the parts

Chapter 2 Installing Your GigaStor
The general steps to install your GigaStor are:
Additional steps to complete the installation are:
page 37
Your GigaStor includes a number of components. Take a moment
after unpacking the kit to locate all of the parts.
One rack-mountable GigaStor system with an installed 10/
100/1000 Ethernet network interface (management) card.
Appropriate capture interface (Gen2 or WAN).
The rack unit may also include a rail kit depending on
which model was purchased.
Windows XP 64-bit operating system and a restore DVD
specific for your GigaStor.
TAP kits for your topology (Ethernet, Fibre Channel, or
WAN), except for the GigaStor 2TE.
Cables
Ethernet cable for each 10/100/1000 interface in your
GigaStor.
Connection cables to connect your GigaStor to a TAP or
switch.
rev. 1

Advertisement

Table of Contents
loading

Related Products for Network Instruments GigaStor 114ff

This manual is also suitable for:

Gigastor portableGigastor expandable

Table of Contents