Protecting Against Electrostatic Discharge; Unpacking The Hardware - NETGEAR ProSafe GSM7248R Hardware Installation Manual

Managed layer 2 switches
Hide thumbs Also See for ProSafe GSM7248R:
Table of Contents

Advertisement

Managed Layer 2 Switches GSM7224R and GSM7248R Hardware Installation Guide

Protecting Against Electrostatic Discharge

Warning: Static electricity can harm delicate components inside your system. To
prevent static damage, discharge static electricity from your body before you
touch any of the electronic components, such as the microprocessor. You can
do so by periodically touching an unpainted metal surface on the switch.
You can also take the following steps to prevent damage from electrostatic discharge (ESD):
1. When unpacking a static-sensitive component from its shipping carton, leave it in the antistatic
package until you are ready to install it. Just before unwrapping the antistatic package,
discharge static electricity from your body.
2. Before moving a sensitive component, place it in an antistatic container or package.
3. Handle all sensitive components in a static-safe area. If possible, use antistatic floor pads,
workbench pads, and an antistatic grounding strap.

Unpacking the Hardware

Check the contents of the boxes to make sure that all items are present before beginning the
installation.
1. Place the container on a clean flat surface, and cut all straps securing the container.
2. Unpack the hardware from the boxes.
Carefully remove the hardware, and place it on a secure and clean surface. See
Location" on page
3. Remove all packing material.
4. Make sure that all items are present. See
Note: If any item is found missing or damaged, contact your local NETGEAR
reseller for replacement.
5. Inspect the products and accessories for damage. Report any damage immediately.
2-2
2-3.
v1.0, November 2007
"Package Contents" on page
"Selecting a
2-1.
Hardware Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Prosafe gsm7224r

Table of Contents