Installation - NETGEAR GS748T GS748T GS748T Hardware Installation Manual

Gigabit smart switch
Table of Contents

Advertisement

This chapter describes the installation procedures for your NETGEAR GS748T Gigabit Smart
Switch. Switch installation involves the following steps:
1. Preparing the site
2. Installing the switch
3. Checking the installation
4. Connecting devices to the switch
5. Installing an SFP GBIC module
6. Applying AC power
7. Switching management through a Web Browser or Utility Program (initial configuration)
Step 1: Preparing the Site
Before you install your switch, ensure that your operating environment meets the environmental
requirements in
Table
Table 4-1. Site Requirements
Characteristics
Mounting
Installations
Access
Power source
Environmental
4-1.
Requirements
Desktop: provide a flat table or shelf surface
Rack-mount: use a 19-inch (48.3-centimeter) EIA standard equipment rack
that is grounded and physically secure. You also need the rack-mount kit
supplied with your switch.
Locate the switch in a position that lets you access the front panel RJ-45
ports, view the front panel LEDs, and access power connector.
Provide a power source
Ensure that the AC outlet is not controlled by a wall switch, which can
accidentally turn off power to the outlet and the switch.
v1.0, January 2007
within 6 feet (1.8 meters) of the installation location.
a
Chapter 4

Installation

4-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs748tau - switchSmart switch gs748t

Table of Contents