Installation and commissioning
8
Connecting the plug connections and earth cable
.02.04
8
Mounting the thread retainers
.03
8 - 5
1
2
Fig. 8 - 08
1
➊
3
Fig. 8 - 09
● Connect all plugs coming from the
● Attach the earth cables from the sewing
● Screw the thread retainers 1 and 2 into
2
4
machine as labelled in the control box.
head and the motor to the rear side fo
the control box as shown in Fig. 8-08.
the tapped holes on the top side of the
machine and fix them with nuts 3 and 4.
When mounting the thread
retainers care must be taken
to see that the thread retainer
with the weak spring
(recognizable from the engraving
91-141 873-91 on the top side) is
mounted in position ➊.