Worcester GREENSTAR CAMRAY EXTERNAL Instruction Manual page 39

Floor standing external oil fired condensing boiler using balanced flue system
Table of Contents

Advertisement

B
C
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY EXTERNAL &
EXTERNAL SYSTEM 12/18-18/25-25/32
8 716 115 667a (05.2009)
STARTING THE APPLIANCE
On 25/32 Appliances:
To achieve the minimum output of 25kW from the
25/32 RDB 2.2 it is necessary to remove the air
guide (D) from the burner. For any other required
output the air guide must remain in place.
A
Disassemble the burner, removing the red
plasic cover, flexible air hose and air intake
manifold (A).
Remove the fan housing (B) by undoing the
four securing screws.
Remove the two screws (C) securing the
plastic air guide.
Remove air guide (D) and reassemble the
burner in reverse order.
STARTING THE APPLIANCE
38

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents