Minimum Mantel And Enclosure Clearances - Napoleon Vittoria GD19N Installation And Operation Instructions Manual

Vented natural & propane gas fireplace
Table of Contents

Advertisement

MINIMUM MANTEL AND ENCLOSURE CLEARANCES

Mantel clearance can vary according to the mantel depth.
Use the graph to help evaluate the clearance needed.
Combustible materials must be installed fl ush with the front
of the fi replace but must not cover any of the black face-area
of the fi replace. Non-combustible material (brick, stone or
ceramic tile) may protrude past the face of the fi replace.
FIGURES 41a&b
TOP OF
FIREPLACE
M
A
N
T
E
L
H
E
I
G
H
T
MANTEL DEPTH
COMBUSTIBLE
6"
20"
1"
53
/
"
1
8
33
/
"
1
8
1"
The fi replace requires a minimum enclosure height of 53 1/8" for a top vent, and 39 1/8" for a rear
vent. For temperature requirements, the enclosure space around and above the fi replace must be left
unobstructed. See fi gures 42 and 43.
8" MANTEL
6"
4"
8"
2"
6"
4"
2"
NON-COMBUSTIBLE
BRICK
0" IF
NON-COMBUSTIBLE
2"
FINISHING IS USED
SUCH AS BRICK
AND STONE.
1"
43
1
/
" MINIMUM
43
/
" MINIMUM
7
8
8
PLUS RISE *
PLUS RISE *
FIGURE 42
COMBUSTIBLE
6"
39
/
"
1
8
33
/
"
1
8
1"
WARNING
!
Do not build into this area - it must be left clear to provide adequate
clearance for the vent. In this 14" wide area centred along the front of
the fireplace, no combustibles are allowed.
1
/
"
1
2
MAXIMUM
14"
MINIMUM
1
/
"
1
2
*FINISHING
MAXIMUM
MATERIAL
OPENING
HEIGHT
MUST BE
34
1
/
"
8
*FINISHING MATERIAL
OPENING WIDTH
/
"
MUST BE 20
1
4
* Dimensions must be maintained for the facing kit to cover the
opening.
NON-COMBUSTIBLE
BRICK
0" IF
NON-COMBUSTIBLE
FINISHING IS USED
2"
SUCH AS BRICK
AND STONE.
1"
26
/
" MINIMUM
3
8
PLUS RISE *
FIGURE 43
1
/
" *
4
*KEEP
FACING
MATERIAL
/
" FROM
1
4
SIDE OF
UNIT.
13
1
/
"
4
FIGURE 44
W415-0612 / C / 01.25.08
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vittoria gd19p

Table of Contents