CHECKLIST—INSTALLATION
Load Calculation
____________
Heating Load (Btuh)
____________
Cooling Load (Btuh)
____________
Furnace Model Selection
COMBUSTION AND VENT PIPING
Termination Location
________
Roof or Sidewall
________
Termination Kit — 2 Pipe or Concentric
________
Combustion-Air Pipe Length
________
Combustion-Air Pipe Elbow Quantity
________
Vent Pipe Length
________
Vent Pipe Length Quantity
Pipe Diameter Determined from Sizing
________
Table
________
Pipe Sloped To Furnace
Pipe Insulation
________
Over Ceilings
________
Low-Ambient Exposed Pipes
Condensate Drain
________
Unit Level or Pitched Forward
Internal Tubing Connections Free of
________
Kinks and Traps
External Drain Connection Leak Tight
________
and Sloped
Condensate Trap Primed before
________
Start-Up
________
Heat Tape Installed if Required
CHECKLIST—START-UP
Gas Input Rate (Set Within 2 percent
________
of Rating Plate)
________
Temperature Rise Adjusted
Thermostat Anticipator
________
Anticipator Setting Adjusted or
________
Cycle Rate (3 Cycles per Hr) Selected
Safety Controls Check Operation
________
Primary Limit
________
Pressure Switch