Step 6—Bottom Closure Panel
These furnaces are shipped with bottom enclosure panel installed
in bottom return-air opening. This panel MUST be in place when
side return air is used.
To remove bottom closure panel, perform following:
(B)
(A)
3
/
-IN. HEX NUT
(A)
8
& WASHER (4)
REQD PER ROD
NOTES:
1. A 1 In. clearance minimum between top of
furnace and combustible material.
2. The entire length of furnace must be
supported when furnace is used in horizontal
position to ensure proper drainage.
Fig. 17—Crawlspace Horizontal Application
FILTER
RETAINER
A93045
15
"
3
5
4
DRAIN
(A)
(B)
13
/
-IN. MAX
16
(B)
ALTERNATE SUPPORT
LOCATION FROM BACK
1. Tilt or raise furnace and remove 2 screws holding front filler
panel. (See Fig. 20.)
2. Rotate front filler panel downward to release holding tabs.
3. Remove bottom closure panel.
4. Reinstall front filler panel and screws.
Step 7—Gas Piping
Gas piping must be installed in accordance with national and local
codes. Refer to current edition of NFGC. Canadian installations
must be made in accordance with NSCNGPIC and all authorities
having jurisdiction. Gas supply line should be a separate line
running directly from meter to furnace, if possible. Refer to Table
2 for recommended gas pipe sizing. Risers must be used to connect
to furnace and to meter. Support all gas piping with appropriate
straps, hangers, etc. Use a minimum of 1 hanger every 6 ft. Joint
compound (pipe dope) should be applied sparingly and only to
male threads of joints. Pipe dope must be resistant to propane gas.
3
-IN. ROD
8
ALTERNATE SUPPORT
LOCATION 4-IN. MIN
8-IN. MAX
A93304

Advertisement

Table of Contents
loading

Table of Contents