Advertisement

Quick Links

5000XHV - U
1: O
VERVIEW
A
:
TTENTION
Read the Safety Instructions before installing the uninterruptible power supply.
The uninterruptible power supply and battery modules are heavy. Select a location sturdy enough to handle the weight.
Refer to the Uninterruptible Power Supply Operation and Setup Guide for information on how to obtain service and support for the
unit.
N
:
Illustrations in this document might vary in appearance from the purchased unit.
OTE
Utility knife or scissors
Two Phillips screwdrivers (#1 and #2)
One wrench (10mm)
Cage nut insertion tool or flat-blade screwdriver (for installing cage nuts in some rack cabinets)
Inventory
Quick Installation Guide
Warranty Flyer
P
NINTERRUPTIBLE
OWER
Important Notices Flyer
PowerChute
Business Edition
software CD
S
- Q
I
UPPLY
UICK
NSTALLATION
Documentation
Network Management Card documentation CD
1
G
UIDE
46M5391

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 5000XHV and is the answer not in the manual?

Questions and answers

Summary of Contents for IBM 5000XHV

  • Page 1 5000XHV - U NINTERRUPTIBLE OWER UPPLY UICK NSTALLATION UIDE 46M5391 1: O VERVIEW TTENTION • Read the Safety Instructions before installing the uninterruptible power supply. • The uninterruptible power supply and battery modules are heavy. Select a location sturdy enough to handle the weight.
  • Page 2: Installation

    Electrical voltage and current from power, telephone, and communication cables are hazardous. To avoid a shock hazard: • Connect power to this unit only with the IBM provided power cord. Do not use the IBM provided power cord for any other product.
  • Page 3 Exchange only with the IBM-approved part. Recycle or discard the battery as instructed by local regulations. In the United States, IBM has a process for the collection of this battery. For information, call 1-800-426-4333. Have the IBM part number for the battery unit available when you call.
  • Page 4 Removing the Battery Modules Remove the two screws that secure the Open the battery compartment door. battery compartment door. Remove the battery modules. Close the battery compartment door. Installing the Uninterruptible Power Supply in a Rack Secure the rack-mount brackets to the Refer to the instruction sheet included in the rail kit for rail installation uninterruptible power supply.
  • Page 5 Installing and Connecting the Batteries and Attaching the Bezel CAUTION Energy hazard present. Shorting might result in system outage and possible physical injury. Remove all metallic jewelry before servicing. (C001) Open the battery compartment door. Install the battery modules. Connect the battery modules. Close the battery compartment door.
  • Page 6: Rear Panel Components

    Power management software and serial port communication can be used with the uninterruptible power supply. Use only cables supplied or approved by IBM. Note: Use the supplied serial cable to connect to the serial port. Do not use a standard serial interface cable because it is incompatible with the uninterruptible power supply connector.
  • Page 7: Communication Options

    3: C OMMUNICATION PTIONS There are two different management options available: network interface or serial interface. (See Rear Panel Components for identification of ports.) These options cannot be used simultaneously. A: N PTION ETWORK ANAGEMENT ONFIGURATION The Network Management Card, installed in the uninterruptible power supply at the factory, allows remote configuration, control, and monitoring of the uninterruptible power supply over the network.
  • Page 8 4: O A: N PTION ETWORK ANAGEMENT ONFIGURATION Note: If a default gateway is unavailable, use the IP address of a computer that is located on the same subnet as the Network Management Card and that is usually running. The Network Management Card uses the default gateway to test the network when traffic is very light.
  • Page 9 Select a serial port at the local computer, and disable any service that uses that port. Use the provided serial cable (IBM part number 46M5366) to connect the selected port to the serial port on the front panel of the Network Management Card.
  • Page 10: Command Line Interface

    Remote access to the command line interface From any computer on the same network as the Network Management Card, you can use ARP and Ping to assign an IP address to the Network Management Card, and then use Telnet to access its command line interface and configure the other TCP/IP settings. Note: After the Network Management Card has its IP address configured, you can use Telnet, without first using ARP and Ping, to access that Network Management Card.
  • Page 11 OW TO ANAGE THE NINTERRUPTIBLE OWER UPPLY THROUGH A ONFIGURED ETWORK ANAGEMENT Once the Network Management Card is running on your network, you can use the following interfaces to monitor and configure the Network Management Card. For the control console: •...
  • Page 12: For Windows Operating Systems

    5: O B: M PTION ANAGING THE NINTERRUPTIBLE OWER UPPLY YSTEM WITH  B OWER HUTE USINESS DITION OFTWARE ® The PowerChute Business Edition (PCBE) software has three components: PCBE Server, PCBE Agent, and PCBE Console, identified in the illustration below: •...
  • Page 13 PCBE A PCBE S DDING GENTS TO A ERVER EVICE During the installation of a PCBE Server, select up to five PCBE Agents for that Server to monitor: • The PCBE Agents must already be installed. • The PCBE Agents must use the same password and user name as the PCBE Server. It is possible to install PCBE Agents after the initial installation.
  • Page 14: Output Voltage Selection

    Select PCBE Server and PCBE Agent or APC PBE Agent, then, right click the mouse and select Stop. The Network Management Card (NMC) is factory installed in the IBM 5000XHV SmartSlot located on the rear panel. The NMC must be removed from the SmartSlot prior to uninterruptible power supply terminal mode configuration.

Table of Contents