Daikin FHYBP35B7V1 Operation Manual page 8

Hide thumbs Also See for FHYBP35B7V1:
Table of Contents

Advertisement

Start-up after a long stop
Confirm the following.
-
Check that the air inlet and outlet are not blocked. Remove
any obstacle.
-
Check if the earth is connected.
-
Is there a broken wire somewhere? Contact your dealer if
there are any problems.
Clean the air filter and outside panels.
-
After cleaning the air filter, make sure to attach it.
Turn on the main power supply switch.
-
The control panel display lights when the power is turned on.
-
To protect the unit, turn on the main power switch at least
6 hours before operation.
What to do when stopping the system for a long period
Turn on FAN OPERATION for a half day and dry the unit.
-
Refer to the manual of the remote controller.
Cut off the power supply.
-
When the main power switch is turned on, some wattage is
being consumed even if the system is not operating.
-
The remote controller display will be switched off when the
main power switch is turned off.
Clean the air filter and the exterior. Be sure to replace the air
filter to its original place after cleaning. Refer to
on page
4.
Disposal requirements
Dismantling of the unit, treatment of the refrigerant, oil and eventual
other parts, should be done in accordance with the relevant local and
national regulations.
Operation manual
6
N
OTES
"Maintenance"
FHYBP + FHYCP + FDYP + FBQ + FCQ + FDQ
Split system air conditioners
4PW10622-1E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents