Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
For further information regarding the individual steps, see the page indicated
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
16
2. Checking all connections on the heating water side
and DHW side for leaks
3. Checking the power supply
5. Gas type conversion (see separate installation
instructions)
system pressure............................................................. 28
electrodes........................................................................ 30
15. Flow limiter...................................................................... 31
16. Checking the function of safety valves
17. Checking firm seating of electrical connections
pressure........................................................................... 31
21. Checking the external LPG safety valve (if installed)
Page