Commissioning, inspection, maintenance
Further details regarding the individual steps
Checking the diaphragm expansion vessel and system pressure
28
(cont.)
Check the diaphragm expansion vessel
pre-charge pressure at test nipple A
and recharge if required.
Note
At the top-up valves, the gas combi
boiler can be topped-up using key B
supplied.
B