Steps - commissioning, inspection and maintenance
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps
•
•
•
•
•
•
2. Checking all connections on the heating water side
•
3. Checking the power supply
•
•
•
5. Gas type conversion (see separate installation
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
14. Flow limiter...................................................................... 27
•
•
•
15. Checking the function of safety valves
•
•
•
16. Checking firm seating of electrical connections
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
21. Checking the external LPG safety valve (if installed)
•
Commissioning, inspection, maintenance
and DHW side for leaks
instructions)
system pressure............................................................. 24
electrodes........................................................................ 26
pressure........................................................................... 27
Page
13