Heat & Glo RED40-NNN Installation Manual page 12

Table of Contents

Advertisement

D
A
Rough
Opening
(Vent Pipe)
Inches
10
Millimeters
254
Figure 3.7. Clearances to Combustibles-RED40
C
D
Inches
Millimeters
Figure 3.8. Clearances to Combustibles-RED40ST
Heat & Glo • RED40-NNN,RED40-NM, RED40-LM, RED40-NNN, RED40ST-LM, RED40ST-NM Installation Manual • 2155-975 Rev. E • 12/14
12
A
B
C
MINIMUM FRAMING DIMENSIONS*
B
C
Rough
Rough
Rough
Opening
Opening
Opening
(Height)
(Depth)
(Width)
46-3/4
18-1/4
50-1/4
1187
464
1276
A
B
MINIMUM FRAMING DIMENSIONS*
A
B
C
Rough
Rough
Rough
Opening
Opening
Opening
(Vent Pipe)
(Height)
(Depth)
10
46-3/4
17-1/4
254
1187
438
F
J
D
E
F
Clearance
Combustible
to Ceiling
Floor
31
0
787
0
F
I
D
E
Rough
Clearance
Combustible
Opening
to Ceiling
(Width)
50-1/4
31
1276
787
MEASURE FROM TOP OF
FIREPLACE OPENING
H
G
I
G
H
Combustible
Behind
Sides of
Flooring
Appliance
Appliance
0
1
0
25
25
MEASURE FROM TOP OF
FIREPLACE OPENING
G
H
F
G
H
Combustible
Sides of
Floor
Flooring
Appliance
0
0
1
0
0
25
E
I
J
Front of
Appliance
1
36
914
E
I
Front or
Rear of
Appliance
36
914

Advertisement

Table of Contents
loading

This manual is also suitable for:

Red40st-lmRed40-nmRed40-lmRed40st-nnnRed40st-nm

Table of Contents