Termination Locations; Flue Termination Minimum Clearances - Heat & Glo Soho-CE Installer's Manual

Hide thumbs Also See for Soho-CE:
Table of Contents

Advertisement

4 4

Termination Locations

A. Flue Termination Minimum Clearances
WARNING
Fire Risk.
Explosion Risk.
Maintain fl ue clearance to combustibles as
specifi ed.
• Do not pack air space with insulation or other
materials.
Failure to keep insulation or other materials
away from fl ue pipe may cause fi re.
Figure 4.1 specifi es minimum fl ue heights for various
pitched roofs.
61 cm
LOWEST
DISCHARGE
OPENING
TERMINATION
CAP
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
Angle
0°-26.6°
........................................................ 0.30*
26.6°-30.3° ........................................................ 0.38*
30.3°-33.7° ........................................................ 0.46*
33.7°-36.9° ........................................................ 0.61*
36.9°-39.8° ........................................................ 0.76
39.8°-42.5° ........................................................ 0.99
42.5°-45.0° ........................................................ 1.22
45.0°-49.4° ........................................................ 1.52
49.4°-53.1° ........................................................ 1.83
53.1°-56.3° ........................................................ 2.13
56.3°-59.0° ........................................................ 2.29
59.0°-60.3° ........................................................ 2.44
*.91 M minimum in snow regions
Figure 4.1 Minimum height from roof to lowest discharge
opening
8
VERTICAL
WALL
H (Min.) M
Heat & Glo • Soho-CE • 2111-900 Rev. i • 10/10
Measure vertical clearances from this surface.
Measure horizontal clearances from this surface.
(See Figure 4.4 for specifi c clearances)
Figure 4.2
A
15,2 cm (minimum) up to 50,8 cm
50,8 cm and over
Gas, Wood or Fuel Oil
Termination Cap
B
Gas
Termination
Cap **
*
If using decorative cap cover(s), this distance may need to be
increased. Refer to the installation instructions supplied with the
decorative cap cover.
**
In a staggered installation with both gas and wood terminations, the
wood termination cap must be higher than the gas termination cap.
Figure 4.3 Staggered Termination Caps
B
45,7 cm minimum
0 cm minimum
A*

Advertisement

Table of Contents
loading

Table of Contents