6 6

Termination Locations

A. Vent Termination Minimum Clearances
WARNING
Fire Risk.
Maintain vent clearance to combustibles as
specifi ed.
• DO NOT pack air space with insulation or other
materials.
Failure to keep insulation or other materials away
from vent pipe may cause overheating and fi re.
8 FEET
LOWEST
DISCHARGE
LISTED B-VENT
OPENING
TERMINATION
CAP
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
Roof Pitch
Flat to 6/12...........................................................1.0*
Over 6/12 to 7/12 .................................................1.25*
Over 7/12 to 8/12 .................................................1.5*
Over 8/12 to 9/12 .................................................2.0*
Over 9/12 to 10/12 ...............................................2.5
Over 10/12 to 11/12 .............................................3.25
Over 11/12 to 12/12 .............................................4.0
Over 12/12 to 14/12 .............................................5.0
Over 14/12 to 16/12 .............................................6.0
Over 16/12 to 18/12 .............................................7.0
Over 18/12 to 20/12 .............................................7.5
Over 20/12 to 21/12 .............................................8.0
* 3 foot minimum in snow regions
Figure 6.1 Minimum Height From Roof To Lowest Discharge
Opening
VERTICAL
WALL
X
12
ROOF PITCH
IS X/ 12
H (Min.) Ft.
Heat & Glo • SL-550 / 750 / 950TV-IPI-E • 2119-900 Rev. N • 1/13
A
6 in. (minimum) up to 20 in.
152 mm/508 mm
20 in. and over
Gas, Wood or Fuel Oil
Termination Cap
B
A *
Gas
Termination
Cap **
If using decorative cap cover(s), this distance may need to be
*
increased. Refer to the installation instructions supplied with the
decorative cap cover.
In a staggered installation with both gas and wood or fuel oil
**
terminations, the wood or fuel oil termination cap must be
higher than the gas termination cap.
Figure 6.2 Staggered Termination Caps
B
18 in. minimum
457 mm
0 in. minimum