Westinghouse WBRE80 User Manual page 22

Premier high efficiency boilers
Table of Contents

Advertisement

22
Single Boiler Space Heating
Figure 9 - Space Heating
NOTES:
1. This drawing is meant to show system piping concept only.
2. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
3. Piping shown is Primary/Secondary.
4. System flow (secondary loop) should be greater than the boiler primary loop flow. In all cases, the boiler primary loop flow rate must be
maintained above the minimum flow rates published in this manual.
5. Installations must comply with all local codes.
6. In Massachusetts, a vacuum relief valve must be installed in the cold water line per 248 CMR.
The piping will not support the weight of the circulators. Refer to the circulator manufacturer's instructions to properly support
the circulator. Failure to comply with these instructions could result in property damage, severe personal injury, or death.
WHL-052 Rev. 4.28.16
Secondary
Circuit
Primary Loop

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wbre220Wbre110Wbre301Wbre399Wbre150Wbre299

Table of Contents