Initial Transfer To The "Standby" Source - Guardian 5240 Diagnostic Repair Manual

Hide thumbs Also See for 5240:
Table of Contents

Advertisement

SECTION 4.2
OPERATIONAL ANALYSIS
The generator is running, the circuit board's "engine warm-up timer" is timing, and generator AC output is avail-
able to transfer switch terminal lugs E1 and E2 and to the open contacts on the transfer relay. Initial transfer to the
STANDBY power supply may be briefly described as follows:
• 12 volts DC output is delivered to the transfer relay (TR) actuating coil, via Wire 194, and terminal A of the
transfer relay (TR) in the transfer switch. This 12 volts DC circuit is completed back to the board, via transfer
relay terminal B, and Wire 23. However, circuit board action holds the Wire 23 circuit open to ground and the
transfer relay (TR) is de-energized.
• When the circuit board's "engine warm-up timer" times out, circuit board action completes the Wire 23 circuit to
ground. The transfer relay then energizes and its normally open contacts close.
0
3
2
1
BATTERY
CHARGER
13
0
0
SCR
56
ELECTRONIC
VOLTAGE
REGULATOR
MANUAL
194
194
15
15
J2
CONTROL
PRINTED CIRCUIT
BOARD
Page 90

INITIAL TRANSFER TO THE "STANDBY" SOURCE

= 12 VDC ALWAYS PRESENT
= AC VOLTAGE
= GROUND FOR CONTROL PURPOSES
224B
1
225B
2
13
0
15
16
56
11
22
4
4
0
6
2
GOVERNOR
ACTUATOR
AUTO
194
15A
15A
15A
SW1
239
239
15
SW2
15B
1
15A
J1
2
4
3
23
4
86
5
18
6
7
8
LC1
9
56
10
224
11
239
12
85
13
14
15
LC2
16
14
17
225
18
19
15B
20
0
21
22
23
90
0
0
16
0
22
11
4
56
15
194
0
F1
15
14
14
CS
14
PART 4
DC CONTROL
= 12 VDC DURING CRANKING ONLY
= 12 VDC DURING ENGINE RUN CONDITION
224B
13
225B
18
86
13
23
18
86
LC1
14
18
86
85
85
4
13
6
2
16
14
0
0
11
22
LC1
LC2
0
23
194
225B
224B
85
LC2
0
224
14
225

Advertisement

Table of Contents
loading

This manual is also suitable for:

52415282528152805242

Table of Contents