Page 3
Important information Before the heat pump is supplied with voltage you must ensure that the heating system and coolant system are filled and bled of air otherwise the circulation pumps can be damaged. If the electrician wishes to test his connections before the above is carried out, this should only done when it has been checked that the coolant pump, the condenser pump, the hot gas pump and the compressor are disconnected.
Page 46
If these instructions are not followed during installation, operation and maintenance, the obligations of Danfoss under the warranty regulations are no longer binding . Danfoss AS Box 950 • SE-671 29 Arvika www.danfoss.com VWBMD102...