Start Up Instructions - Flowmatic FMRO5-M-MT Installation, Operation And Maintenance Manual

Table of Contents

Advertisement

Start up Instructions

Step 1
Turn on the incoming cold water at the angle stop valve. Open the needle valve on the
brass Adapta Valve by turning counter clockwise. Check the system for leaks and tighten
any fi tting as necessary. (Check frequently over the next 24 hours to ensure no leaks are
present).
Step 2
Open the RO faucet and leave it open until water begins to trickle out, (it will come out
slowly).
Step 3
After water trickles out of the faucet, close RO faucet so the tank will fi ll with water.
tank will take approximately 6 hours at fi rst to fi ll completely depending on the size of the
membrane, local water temperature and pressure.
Step 4
After the Tank has fi lled, open the RO Faucet and drain the Tank completely to remove
carbon particles from the system. Repeat steps 3 and 4, this initial fl ushing of the system
should take about a day to complete.
during initial installation.
Step 5
If system is connected to an Ice Maker, turn the Ice Maker off until fl ushing is complete
and the tank has refi lled. The system should have an in-line valve installed before the Ice
Maker so it can be closed to prevent water fl owing to the Ice Maker. Your tank must be
allowed to fi ll up in order for the unit to shut off. (If you are installing an Ice Maker Kit, tee
off after the fi nal fi lter).
Note:
Your reverse osmosis system contains replaceable treatment components that are critical
for effective contaminant reduction. Periodic inspection and following proper system
maintenance is critical for continued performance.
Note: The fl ushing of the system is only necessary
Page 12
The

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fmro5-m-pt

Table of Contents