Verify proper sequence of operation
The sequence can be followed via the diagnostic indicator lamps on
the Honeywell S9301A integrated boiler control in Figure #16.
This is the normal sequence of operation. A more detailed sequence
of operation containing potential faults can be found in the service
hints section.
figure 16 - indicator lamps
CHeCk ouT proCedure and adjusTmenT
SEQUENCE OF OPERATION
"Power ON, boiler standing by. Lamp A is illuminated
indicating 2 Volt power is being supplied to the inte-
grated control."
Thermostat calls for heat, energizing system circulator
"Integrated boiler control goes through self check of
internal circuitry (1-2 seconds) and energizes draft
inducer"
"Draft inducer comes up to speed and establishes com-
bustion airflow, causing the normally open differential
pressure air proving switch contacts to close. Lamp B is
illuminated indicating that combustion airflow is proved
and the 15 second pre purge cycle"
"DIAGNOSTIC
INDICATOR
36
LAMPS"
A.
B.
C.
D.
E.
A.
B.
C.
D.
E.
A.
B.
C.
D.
E.
A.
B.
C.
D.
E.