Toshiba RAS-13UKH-ES3 Service Manual page 65

Table of Contents

Advertisement

No.
Part name
4
Heat exchanger
1) Remove the front panel, electrical part and
2) Remove the pipe holder at the rear side of
3) Remove the 2 screws on the heat exchanger
4) Remove the 2 screws on the heat exchanger
5
Cross flow fan
1) Remove the front panel, electrical part,
2) Remove the 2 screws on the band motor (L)
3) Loosen the set screw of the cross flow fan
Notice
To assemble cross flow fan and fan motor to the
unit, please turn the fan motor unit the center of
its terminal meets the lowest point of band motor
(R) (point A).
Fix the cross flow fan with the set screw at the
position where the gap between the back body
and the right surface of the cross flow fan is
6 mm.
6
Base bearing
1) Remove the front panel, electrical part,
2) Remove the 2 screws fixing the base bearing.
3) Remove the bearing from the base bearing. If
Procedures
the horizontal louver following procedure 3.
main unit.
at the base bearing.
at the 2 fixed plates (upper and lower) from
the back body, and then pull out the upper
side of the heat exchanger slowly.
horizontal louver and the heat exchanger
following procedure 4.
and remove the 2 screws on the band motor
(R) and then remove the cross flow fan.
then separate the fan and the fan motor.
horizontal louver, heat exchanger and the
cross flow fan following procedure 5.
the housing protrudes from the base bearing,
put the housing in position and attach the
bearing to the base bearing.
– 64 –
FILE NO. SVM-04017
Remarks
2 Pipe holder
3
2-Screws
2
2-Screws
(R)
2 2-Screws (L)
6 mm
6 Set screw
Middle of the fan motor terminal
2
2-Screws
4
2-Screws

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents