IBM eServer 150 xSeries Installation Manual page 50

Hide thumbs Also See for eServer 150 xSeries:
Table of Contents

Advertisement

38
IBM® xSeries 150: Installation Guide
7
B
Press in on the safety latches
server halfway into the rack. Attach the power,
keyboard, mouse, and monitor cables
(if required) to the server and route them
through the cable restraint bracket
attach all other required cables to the server.
9
A
Slide the server into the rack until the release
latches
snap shut. Then, insert the M6 screws
A
through the release-latch-bracket assembly.
B
Note:
Inserting the M6 screws
you are moving the rack or the rack is in a
vibration-prone area.
Refer to your server documentation to complete the installation.
Store these instructions in the binder that comes with your server.
8
A
and slide the
Route all the cables through the cable-
A
management assembly as shown. Then, use
the cable straps
the cables to the cable-management assembly
. Then,
B
B
is optional, unless
B
A
or the cable ties to secure
A
P/N 19K0804
Printed in the U.S.A.
®

Advertisement

Table of Contents
loading

Table of Contents