Slant/Fin Victory II VHS-30EP Installation And Operating Instructions Manual page 6

Hide thumbs Also See for Victory II VHS-30EP:
Table of Contents

Advertisement

6
Boiler
Model No.
VHS-30,
60, 90
and 120
VHS-150
VHS-180
Boiler
Model No.
VHS-30,
60, 90
and 120
VHS-150
VHS-180
Boiler
Model No.
VHS-30,
60, 90
and 120
VHS-150
VHS-180
Note: Vent termination is in addition to the allowed equivalent length.
Heat-Fab Saf-T Vent System
Max. Equivalent Length (Ft.)
0 to
5500 to
5500 Ft.
7000 Ft.
Altitudes
Altitudes
40
40
40
40
40
20
ProTech FasNSeal System
Max. Equivalent Length (Ft.)
0 to
5500 to
5500 Ft.
7000 Ft.
Altitudes
Altitudes
30
30
30
30
30
15
Flex-L StaR-34 and Z-Flex Z-Vent System
Max. Equivalent Length (Ft.)
0 to
5500 to
5500 Ft.
7000 Ft.
Altitudes
Altitudes
35
35
35
35
35
18
Equivalent
7000 to
Length of
10,000 Ft.
each 90°
Altitudes
Elbow, Ft.
40
3
20
3
20
3
Equivalent
7000 to
Length of
10,000 Ft.
each 90°
Altitudes
Elbow, Ft.
30
6
15
6
15
6
Equivalent
7000 to
Length of
10,000 Ft.
each 90°
Altitudes
Elbow, Ft.
35
6
18
6
18
6
V
II
ICTORY
VHS Models
Minimum
Length, Ft.
2
2
2
Minimum
Length, Ft.
2
2
2
Minimum
Length, Ft.
2
2
2

Advertisement

Table of Contents
loading

Table of Contents