Care And Maintenance - Slant/Fin Victory II VHS-30EP Installation And Operating Instructions Manual

Hide thumbs Also See for Victory II VHS-30EP:
Table of Contents

Advertisement

V
II
ICTORY
VHS Models
Figure 24.
1. High Limit Control Test
Set thermostat high enough for water temperature to
reach high limit control setting of water temperature
control. When this temperature is reached, the high limit
switch should open and the main gas valve should close
automatically.
2. Gas Control Safety Shutdown Test
With main burners firing, disconnect the ignition cable
from S8600 ignitor (see Figure 21).
Gas valve should shut off the main burners. If gas valve
fails to shut off the main burners, replace the gas valve.
3. Air Flow Pressure Switch Test
With main burners firing, remove plastic hose from Pres-
sure Switch (see Figure 26). Gas valve should shut off
the main burners.
Figure 25.
WARNING: If any of the above controls fail to operate
properly, they must be replaced.
4. Checking for Gas Leaks
Using soap solution, check for gas leaks from meter to
burner, including gas valve, gas piping, manifold and
pilot burner.
DO NOT use open flame.
Figure 26.

CARE AND MAINTENANCE

This section must be brought to the attention of the owner by
the installer so that the owner can make the necessary
arrangements with a qualified service agency for the periodic
care and maintenance of the boiler. The installer must inform
the owner that the gas supplier can recommend a number of
qualified service agencies. The installer must also inform the
owner that the lack of proper care and maintenance of this
boiler and any fuel burning equipment may result in a haz-
ardous condition. Installer should discuss contents of the
User's Information Manual (Publication VHS-UIM) with the
owner.
A trained and qualified service technician should perform the
inspections listed in these instructions before each heating
season and at regular intervals.
1. General Maintenance
A. Boiler control check. See "Safety Check" on Page 28.
B. Venting system inspection
1. Check for obstructions, condensation, corrosion and
physical damage.
2. Perform "Venting System Regular Inspection" on
Page 14.
3. If the boiler is vented horizontally through the wall,
the outside termination and screen should checked
for any debies blocking the opening and cleared as
a required.
29

Advertisement

Table of Contents
loading

Table of Contents