Ebm Installation (Optional) - Orion Network Pro 1500 RTX User Manual

Line interactive ups
Table of Contents

Advertisement

3.4 EBM Installation (Optional)

 Connecting the EBM in Tower form:
1. Hold the UPS and EBM vertically and place two UPS stands with the extend part at each end of the tower.
2. Tighten the screw on the metal sheet for stabilization
3. Connect EBM port C to UPS port D with one of the accessory wire.
 Connecting the EBM in a rack form
1. Using the same method as assembling UPS in a rack form, assemble EBM into the rack-mounting on the top
or bottom of the UPS.
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Network pro 2200 rtx

Table of Contents