GeneralAire SSCB-7 SERIES Operation And Maintenance Manual

Semi-flush ceiling mounted electronic air cleaner

Advertisement

Quick Links

Operation And Maintenance Manual
SSCB-7 SERIES
SEMI-FLUSH CEILING MOUNTED
ELECTRONIC AIR CLEANER
IMPORTANT: PLEASE READ MANUAL BEFORE INSTALLING,
OPERATING, CLEANING OR SERVICING UNIT

Advertisement

Table of Contents
loading

Summary of Contents for GeneralAire SSCB-7 SERIES

  • Page 1 Operation And Maintenance Manual SSCB-7 SERIES SEMI-FLUSH CEILING MOUNTED ELECTRONIC AIR CLEANER IMPORTANT: PLEASE READ MANUAL BEFORE INSTALLING, OPERATING, CLEANING OR SERVICING UNIT...
  • Page 2: Table Of Contents

    IMPORTANT: Please read entire instructions before Installation and servicing of Electronic Air Cleaners installing the Electronic Air Cleaner. can be hazardous. Only trained and qualified service personnel should install, repair, or service Electronic CONTENTS Air Cleaners. Untrained personnel perform basic SAFETY CONSIDERATIONS maintenance functions of cleaning and replacing WHAT THE ELECTRONIC AIR CLEANER DOES...
  • Page 3: Major Components

    approximately 7500 VDC. The collecting plates are alternately grounded and charged at 5000 VDC. The arrow on the cells indicates the direction of air flow which must point up towards the fan motor. Cleaner Motor and Fan Blade creates a circular air flow pattern which...
  • Page 4: Wiring

    the unit so that the flange is flush with the underside The frequency of cleaning will vary from one environment of the ceiling. to another. The following is an average wash cycle: Leave enough room around the Air Cleaner for Stores, Offices, Computer &...
  • Page 5: Service

    are corrosive or abrasive or detergents containing and the cell access door closed. The Air Cleaner chlorine or ammonia. should be on at least 5 minutes to allow voltage to stabilize. 2. Remove the hinged cover and the cover panel from power box.
  • Page 6: Testing The 24 V Transformer

    6. Replace the hex nuts removed in Step 3. Ensure the 11. Turn ON the power to the Air Cleaner and test. star washer is in place over the nut at the ground location under the power board. For proper grounding Setting Voltage Of Power Board the washer must be located under the power board.
  • Page 7: Testing Cell For Bad Contacts

    Testing Cell For Bad Contacts 6. Install cell in Air Cleaner. 1. Remove the cover and power box cover panel. 7. Return power to Air Cleaner. 2. The cell must be in the Air Cleaner for this test. 8. Test cell for proper operation. 3.
  • Page 8: Electrical Schematic

    Fig. 5 — Electrical Schematic - 120 Volt Fig. 6 — Electrical Schematic - With Wired Remote - 120 Volt...
  • Page 9: Troubleshooting Guide

    Table 1 — TROUBLESHOOTING GUIDE PROBLEM PROBABLE CAUSE REMEDY Unit does not function Main breaker or fuse. Check breaker or fuse and reset or replace if necessary. correctly. Power switch Remote switch off. If equipped with a remote switch ensure it is turned on. ON and performance indicator light and Wiring or plug improperly connected.
  • Page 10: Exploded View

    Fig. 7 — Exploded View and Parts List Description Part Number Description Part Number Fan Motor EACCM7-01 Power Switch (Gray) EACCM13-12W Fan Blade EACCM7-02 12a Power Switch (Black) EACCM13-12G Copper Contact EAC14-08 3-Position Slide Switch (Gray) EACCM13-13W Fibreboard (with 2 Copper Contacts) EACCM7-04 13a 3-Position Slide Switch (Black) EACCM13-13G...
  • Page 11: Technical Data And Dimensions

    Dimensions Length 24 in 61.0 cm Width 28 in 71.0 cm Height 15 in 38.1 cm Weight 70.0 lbs 32.0 kg Input Voltage 120 V 60 Hz Power Consumption 150 Watts (maximum) Air Flow 712 CFM 1210 m Medium 575 CFM 977 m 440 CFM 748 m...
  • Page 12: Warranty

    ELECTRONIC AIR CLEANER LIMITED ONE YEAR WARRANTY Electronic Air Cleaners, if properly registered by the return of the attached warranty registration to General Filters, Inc., are warranted to the consumer against defects in materials and workmanship for a period of one year from the date of installation, so long as the product has been installed and operated in accordance with all appropriate manuals and wiring diagrams.

Table of Contents