GFS 1000 Safety & Operation Manual page 13

Gas concrete nailer
Table of Contents

Advertisement

Before actually beginning the nailing work, test the
Nailer by using the checklist below. Conduct the
tests in the following order.
If abnormal operation occurs, stop using Nailer and
contact a
authorized service center immediately.
(1) REMOVE ALL NAILS, FUEL CELL AND BATTERY
FROM NAILER.
■ ALL SCREWS MUST BE TIGHTENED.
■ THE PUSH LEVER AND TRIGGER MUST MOVE
SMOOTHLY with pulling back the feeder knob.
Push Lever
(2) Installing the battery.
Do not operate the push lever or trigger while installing
the battery.
Make sure the battery indicator light is flashing green.
If the battery indicator light is flashing red, the battery
doesn't have enough power and it needs to be charged.
BATTERY INDICATOR LIGHT
Battery Indicated Light
Trigger
Nail Feeder
Handle
insert
Battery Pack
Latch
Flashing GREEN: Enough power remaining
(The light turns steady during operation).
Flashing RED: Insufficient power remaining
(The light turns steady during operation).
(3) INSERT FUEL CELL INTO NAILER.
Pulling the latch and open the cell cover.
Latch
Insert the fuel cell into nailer.
Insert the stem of fuel cell into the hole of
adaptor.
Adapter
Stem
Close the cell cover.
Lock up the latch
Cell Cover
Fuel Cell
Stem
Fuel Cell
Cell Cover
.
12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents