3. Defrost Flow Chart
The defrosting shall proceed by the integrating operation time, outdoor temperature
and outdoor heat exchanger temperature as follows.
1st defrost
Compressor
integrating
operation:
Over 22 minutes
Outdoor
Outdoor
heat exchanger
heat exchanger
temperature:
temperature:
Below 23°F(- 5°C)
Below 15.8°F(- 9°C)
Heating operation start : Compressor ON
2nd and later defrost
Compressor
Compressor
integrating
integrating
operation:
operation:
Over 62 minutes
Over 35 minutes
Outdoor
heat exchanger
temperature:
Below 21.2°F(- 6°C)
Defrost Indicator:
[Operation lamp]
7 sec ON / 2 sec OFF
Outdoor heat exchanger temperature: Over 55° F(13°C)
Compressor ON time: Maximum 15 minutes
(Not defrosted for 10 minutes)
Defrost start
Compressor : OFF
Outdoor fan motor : OFF
30 sec later 4-way valve : OFF
35 sec later compressor : ON
or
Defrost end
01-14
Integrating defrost
(Constant monitoring)
Compressor
Compressor
integrating
OFF count :
operation:
40 times
Over 210 minutes
Outdoor
heat exchanger
temperature:
Below 26.6°F(- 3°C)