Cylinder Removal And Installation; Main Boom Telescope Cylinder Removal - JLG 740A Service And Maintenance Manual

Articulating
Table of Contents

Advertisement

SECTION 5 - HYDRAULICS
Table 5-2. Holding Valve Torque Specifications
HOLDING VALVE TORQUE SPECIFICATIONS
Description
SUN - 7/8 hEX m20 X 1.5 this.
SUN - 1 1/8 HEX 1 - 14 UNS THDS.
SUN - 1 1/4 HEX m36 X 2 THDS.
RACINE - 1 1/8 HEX 1 1/16- 12 THDS.
RACINE - 1 3/8 HEX 1 3/16- 12 THDS.
RACINE - 1 7/8 HEX 1 5/8- 12 THDS.
5-10
Torque Value
30-35 ft. lbs.
(41 - 48 Nm)
45 - 50 ft. lbs.
(61 - 68 Nm)
150 - 160 ft. lbs.
(204 - 217 Nm)
50 - 55 ft. lbs.
(68 - 75 Nm)
75 -80 ft. lbs.
(102 -109 Nm)
100-110 ft. lbs.
(136 - 149 Nm)
Figure 5-13. Components Main Boom and Tower Boom
– JLG Lift –
5.6 CYLINDER REMOVAL AND
INSTALLATION

Main Boom Telescope Cylinder Removal

1. Place machine on a flat and level surface, with main
boom in the horizontal position. Extend telescope
up to gain access to main fly boom telescope cylin-
der, rod end pin #1.
2. Shut down engine. Support main boom platform
end with a crane of adequate capacity.
HYDRAULIC LINES AND PORTS SHOULD BE CAPPED IMMEDIATELY
AFTER DISCONNECTING LINES TO AVOID THE ENTRY OF CONTAMI-
NANTS INTO THE SYSTEM
3. Tag and disconnect hydraulic lines to telescope cyl-
inder. Use suitable container to retain any residual
hydraulic fluid. Cap hydraulic lines and ports.
4. Remove the retaining rings that retain the telescope
cylinder rod to the fly boom.
5. Using a suitable brass drift, carefully drive telescope
cylinder rod pin from the fly boom.
3121160

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

740aj

Table of Contents