Pre-‐Operating
I nstructions:
G enerator
S etup
CAUTION:
A ny
a ttempt
t o
s tart
t he
g enerator
b efore
i t
h as
b een
p roperly
s erviced
m ay
result
i n
e ngine
f ailure
a nd
v oid
w arranty.
GROUNDING
T HE
G ENERATOR:
1. Connect
t he
G round
T erminal
o n
t he
g enerator
t o
a n
a cceptable
s ource
o f
electrical
g round,
s uch
a s
a
c opper-‐grounding
s take,
u sing
c opper
e lectrical
w ire
with
a
m inimum
d iameter
o f
1 6
g auge.
BATTERY
A SSEMBLY
A ND
M AINTENANCE:
1. Remove
L eft
A ccess
P anel.
2. Insert
b attery
i nto
b attery
t ray.
3. Install
b attery
c over
a nd
t ighten
c lamping
n uts.
4. Disassemble
t he
s etscrew,
t hen
c onnect
t he
w ires.
T he
r ed
t erminal
i s
a node
( +)
and
t he
b lack
t erminal
i s
c athode
( -‐).
5. Reinstall
L eft
A ccess
P anel.
R efer
t o
t he
d iagram
b elow.
16
LIFAN
P ower
U SA
2205
I ndustrial
P ark
R oad
Van
B uren,
A R
7 2956
866-‐471-‐7464
www.lifanpowerusa.com