Installing and Operating the Workstation 2015
Installation
.
Figure 4-3: Preparing to Attach the PCWS 2015 to the Adjustable Stand
3. Mount the cabled workstation by placing the rubber feet into the
receptacles on the adjustable stand. Figure 4-4, below.
Figure 4-4: Mounting the Workstation to the Adjustable Stand
4-10
PCWS 2015 Setup Guide - 2nd Edition