Run-In Procedure Using Load Bank - Miller Electric 500DX R Owner's Manual

Engine driven welding generator
Table of Contents

Advertisement

9-2. Run-In Procedure Using Load Bank

2
3
4
1
Y
Stop engine.
Y
Do not touch hot exhaust
pipe, engine parts, or load
bank/grid.
Y
Keep exhaust and pipe away
from flammables.
1
Load Bank
Turn all load bank switches Off. If
needed, connect load bank to 115
volts ac wall receptacle or genera-
tor auxiliary power receptacle.
2
Welding Generator
Place A/V range switch in maxi-
mum position, A/V control in mini-
mum position, and Output Selector
switch (if present) in either DC
position.
3
Weld Cables
Connect load bank to generator
weld output terminals using proper
size weld cables with correct
connectors.
Observe
correct
polarity.
Start engine and run for several
minutes.
Set load bank switches and then
adjust generator A/V control so
load equals rated generator output
(see nameplate).
Check generator and load bank
meters after first five minutes then
every fifteen minutes to be sure
generator is loaded properly.
.
Check oil level frequently dur-
ing run-in; add oil if needed.
After one hour (minimum) place
A/V control in minimum position,
then turn off load bank to remove
load. Run engine several minutes
at no load.
Y
Stop engine and let cool.
4
Engine Exhaust Pipe
Repeat procedure if wetstacking is
present.
S-0683
OM-129 647 Page 43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Om-129Big blue 500dx

Table of Contents