Changing Components - Main ECO ELITE COMBI 25 Installation & Service Manual

Condensing central heating boiler
Table of Contents

Advertisement

Electrode
Leads
Fig. 54
Electrode
Electrode
Leads
Fig. 55
34
© Baxi Heating UK Ltd 2015
Igniter
Igniter Feed
Plug
Sealing
Gasket
Spark

13.0 Changing Components

IMPORTANT: When changing components ensure that
both the gas and electrical supplies to the boiler are
isolated before any work is started. When the
component has been changed turn the selector switch
fully anticlockwise against the spring pressure to the
reset position and hold for 5 seconds to reset the boiler
before recommissioning.
See Section 12.2 "Annual Servicing" for removal of case
panel, door etc.
13.1
Igniter (Fig. 54)
1. Disconnect the igniter feed plug and the electrode leads,
noting their positions.
2. Undo the nuts and screws securing the igniter to the
boiler top panel. Remove the igniter.
3. Fit the new igniter and reassemble in reverse order.
13.2
Electrode Assembly (Fig. 55)
1. Disconnect the electrode lead caps, remove the strain
relief clip from the sensing lead and disconnect the lead.
2. Undo the screws securing the electrode assembly to the
combustion box panel and remove the assembly.
3. Check the condition of the sealing gasket and replace if
necessary. Reassemble in reverse order.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eco elite combi 30

Table of Contents