Operation; Floorboard Installation (Models With Wood Floors) - Mercury Heavy Duty 899846001 Owner's Manual

Mercury marine inflatable boat owner's manual
Table of Contents

Advertisement

Floorboard Installation (Models with Wood Floors)

NOTE: The floorboards must be installed into the boat before the
boat is inflated.
a -
Side joiners
1. Clear a flat surface, making sure it is clean and free of sharp
objects.
2. Unfold the boat and spread it out flat.
3. Slide the front floorboard No. "1" into the bow. Position the
hole opening over the keel air chamber valve. Fit floorboard
No. "2" with the front floorboard.
a -
Floorboard No. "2"

OPERATION

2
1
b
a
25
a
4
3
a
24015
b -
Front floorboard
5
24013

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Heavy duty 380Heavy duty 430Heavy duty 530

Table of Contents