Installation Details; Wrench Torque Sheet For Installation; Connecting The Cables; Pipe Length And The Elevation - Vivax ACP-09CH25AEM Service Manual

Hide thumbs Also See for ACP-09CH25AEM:
Table of Contents

Advertisement

7. Installation details

7.1

Wrench torque sheet for installation

Outside diameter
mm
inch
φ6.35
1/4
φ9.52
3/8
φ12.7
1/2
7.2

Connecting the cables

The power cord of connect should be selected according to the following specifications sheet.
Grade
Unit
7K
9K
2
mm
1.0
1.0
7.3

Pipe length and the elevation

Pipe size
Capacity
Btu/h
GAS
07k~09K
3/8'' (φ9.52)
12K
1/2'' (φ12.7)
18K
1/2'' (φ12.7)
Caution:
Capacity is base on standard length and maximum allowance length is base of reliability.
Oil trap should be install per 5-7 meters.
11
Service manual
Torque
Kg.m
1.8
4.2
5.5
12K
18K
1.5
2.5
LIQUID
1/4'' (φ6.35)
1/4'' (φ6.35)
1/4'' (φ6.35)
Standard
Max.
length
Elevation
(m)
B (m)
5
8
5
8
5
10
Max.
Additional
Pipe
refrigerant
length
(g/m)
A (m)
20
30
20
30
25
30
In case that
more than
5m.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acp-18ch50aemAcp-12ch35aem

Table of Contents