Assembly; Heater Assembly; Slide Upper Shell Assembly Up And Off Lower Shell - Dyna-Glo RMC-LPC25DG User's Installation, Operation And Maintenance Manual

Table of Contents

Advertisement

NEVER LEAVE THE HEATER UNATTENDED WHILE BURNING!
Assembly Time: 10 minutes
Contents
All Models: Unit, Manual, Hose and Regulator

Assembly

LPC80 and 200 Series Include:
Upper Shell, Lower Shell and Hardware Kit With
Screws (8)
Tools Required for Assembly
All Models: Adjustable Wrench
LPC80 and LPC200 Series: Phillips head screwdriver

Slide upper shell assembly up and off lower shell.

For Technical Support or Troubleshooting, Call: 1-877-447-4768
www.ghpgroupinc.com
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents