FINISHING THE INSTALLATION
Final Checks before Leaving Site
Use the checklist on the following pages to verify all tasks have been completed prior to calling for the Multi V system to be commissioned.
Place the System ID and Indoor Unit ID at the top of the page, sign and date. Provide a copy to your company's project manager or your
Multi V System Commissioning Technician.
• After completing the final checks, be sure to reinstall all internal and external covers.
• Be sure power is not connected to the unit. Power will be connected at commissioning.
• If any installation items are incomplete, note the items on the checklist and be sure your supervisor is aware.
• Check the installation area for tools and debris that may have been left behind.
• If all installation items are correctly completed, the indoor unit is ready for power-up and commissioning.