    List of Figures Figure 1. Assembly Drawing, Model G3………….….………………………….…. ….5 Figure 2. Assembly Drawing, Model G4………….….………………………….….…..6 Figure 3. Water Flow Chart G3 & G4……………….….………………………….……..7 Figure 4. Water Cooler Connections………………...………………………………..9 Figure 5. Drain Connections for “RO” Models………………………………..11 Figure 6. Filter Configuration Model “F”………………………………………..13 Figure 7.
  • Page 3: Introduction

    G3 and G4 Models Both of these models have two temperature faucets. The cold water is chilled around 44ºF and the hot water is heated at 180ºF.
  • Page 4: Receiving

    The water is dispensed from two spigots—one “hot” and one “cold.” The assembly drawing is shown in Figure 1 for the G3 and Figure 2 for the G4. Water flows from the filter system into the top tank, also known as the cold water tank.
  • Page 5: Description Model G3 & G4

    Description Model G3 Figure 1. Assembly Drawing Model G3 P a g e...
  • Page 6: Figure 2. Assembly Drawing Model G4

    Description Model G4 Figure 2. Assembly Drawing Model G4 P a g e...
  • Page 7: Water Production Flow Chart

    Water Production Flow Chart Model G3 & G4 Figure 3. Water Flow Chart P a g e...
  • Page 8: Positioning The Cooler

    Positioning the Cooler 1) It is not recommended to install this cooler in an area were water may cause severe or costly damage. 2) Do not position the cooler where it can be hit or bumped by vacuum cleaners or floor waxing machines. This can cause breaks in the waterline, connection fittings, and compressor tubing.
  • Page 9: Water Cooler Connections

    Water Cooler Connections When you receive the water cooler, the water connections on the back of the cooler have tube plugs in them. These tube sections must be removed before making all your connections. To remove the tube sections see Figure 7, “Disconnect”. The one-quarter inch plastic tubing should be used for making the Feed Water and Drain connections.
  • Page 10: Feed Water Connection

    Feed Water Connections 10 | P a g e...
  • Page 11: Drain Connection

    Drain Connection The drain connection applies to models with Reverse Osmosis, “RO.” The black drain line in the back (Figure 4) must be hooked to the drain line ahead of the normal sink water trap. See Figure 5 below. Place the two-part drain saddle on the drain pipe before the drain trap.
  • Page 12: Ez Connections

    EZ Connections The standard tubing connections on the water coolers are EZ connect fittings. Use tubing and follow the instructions below in Figure 7 to make the connections. If you cut the tubing, make sure it is a square cut, fits squarely in the fitting, and seals properly. Cut the tube square.
  • Page 13: Start Up Flush

    Start-Up Flush Open lower front door to access filter assembly. Then, turn the water on at the at the water connection. This brings water to the ball valve. Disconnect the tube from the second stage carbon filter (red circle in figure bellow), and place a cup or pan right underneath the hole to catch water.
  • Page 14: Tank Flush

    Observe the water level when full, and see that the water input to the tank stops when it is full. Figure. 7 Back view of the Cooler Water Connections Model G3 & G4 14 | P a g e...
  • Page 15: Cleaning And Maintenance

    Cleaning and Maintenance Sanitize Fill the main water tank with water. Add one to two teaspoons of liquid chlorine bleach. Let stand for five to 10 minutes. Drain the water, then let water from filters refill tank and drain a second time. Remember to drain from dispensing spigots also.
  • Page 16: Filter Replacement

    Reverse Osmosis membrane filter. The three pre-filters must be replaced every six months. The Reverse Osmosis membrane must be replaced every three years. Replacement Procedures, Filtration Versions (F) G3 and G4 Coolers a) TURN OFF POWER TO HOT/COLD ELEMENTS. b) Swing open the front hinged cover.
  • Page 17: Reverse Osmosis Membrane Replacement

    Reverse Osmosis Membrane Replacement (every three years) RO versions (RO) a) Use the same procedure as above sec a-c. b) Remove the RO stage from the clips. Disconnect the white tubing from the RO housing cap. c) Remove the cap from the housing by unscrewing it. d) Using a pair of pliers, remove the RO element from the housing by grasping the tube end and pulling it out.
  • Page 18: Troubleshooting

    Trouble Shooting Guide PROBLEM CAUSE SOLUTION No Power No electric current Make sure the cooler is flowing. plugged in and check for improper connections. Cold Water not cold The cooler is placed too Provide a minimum of enough close to the wall. a five inch space between wall and back Wire Condenser on...
  • Page 19: Specifications

    Electric Power Cord Length 6Ft. 6Ft. Warranty All Global Water products are warranted to be free from defects in materials and workmanship under normal use within the condition of operation listed for a period of one year from the date of purchase. The compressor has a 3-year warranty.