Appendix D: Changing The Lnt Module's Battery - Meade LX90 Instruction Manual

8" schmidt-cassegrain telescope autostar lnt smartfinder
Hide thumbs Also See for LX90:
Table of Contents

Advertisement

Side
Alignment
Top
Alignment
screw
screw
Fig. 34: The LNT Module, with
alignment screws and Atomic Time
Update port visible.
Alignment
Top
screw
Atomic Time
Update Port
Side
Alignment
Spring
screw hole
Fig. 35: Interior side view of LNT
Module.
Alignment
Top
screw hole
Cover
Battery
Side
Spring
Alignment
screw hole
Fig. 36 Interior top view of LNT module.
APPENDIX D: CHANGING THE LNT MODULE
BATTERY
The LNT Module uses a lithium coin CR2023 battery that will last about 5 years
and is installed with the original LNT Module assembly. After you replace the
battery, you will need to recalibrate the telescope's sensors and reset the time and
date. You will need a new battery. Also, you may use Meade's optional Atomic Time
Update Module, although this is not necessary.
To replace the battery:
1. Remove the top alignment screw cap/long bolt from the LNT Module. See Fig.
34.
2. Remove the side alignment screw cap/long bolt from the LNT Module. Take
note that there are two springs inside the LNT. One spring sits between the
top and bottom of the unit. The second spring is on the side of the unit that
rests between the bottom and the top sections. One long bolt passes through
the top spring and the other long bolt passes through the side spring. Set the
springs aside as you will need to replace it later in this assembly . See Fig. 35
and 36.
Important Note: Note there is some wiring inside the LNT Module. Be careful
not to pull on the wiring. If it is necessary to move the wiring aside, do so
carefully.
3. Carefully lift the top section of the unit from the bottom section. Do not remove
the bottom section or disassemble the rest of the unit.
4. Remove the old battery. Note the spring.
5. Insert the new (user-supplied) battery. Take care to orient the battery so that
the side with the battery markings is facing the top.
6. Replace the top spring in place and the LNT Module cover.
7. Replace the top bolt and tighten the cap to a firm feel.
8. Hold the side spring in place with your fingers and slide the spring between
between the top and bottom sections. The spring should line up with the
mounting holes for the side long bolt. Slide the long bolt through the side hole,
then through the spring and finally through the bottom of the LNT Module and
tighten to a firm feel.
9. Next you will need to recalibrate the LNT Module sensors. Select Calibrate
Sensors from the Setup: Telescope menu.
10. Press ENTER. The telescope will automatically find North, detect level and the
tilt of you telescope, and calibrate the sensors.
11. Next, follow the instructions included with the Atomic Time Update Module
optional accessory to reset the clock.
OR
Enter the date and time manually using the Date and Time options in the Setup
menu.
54

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lx-90-lnt

Table of Contents