Installing The Switch - Dell S6000-ON Getting Started Manual

Open networking (on)
Hide thumbs Also See for S6000-ON:
Table of Contents

Advertisement

Figure 4-4. Four-Post Threaded Configuration

Installing the Switch

You can mount the switch in the 1U front-rack or 1U two-post (flush and center)
configurations. The following is an example of a 1U front-rack configuration.
For the 1U two-post (flush and center) configurations, slide the switch into the
rails in the same manner as the four-post configurations.
1U Front-Rack Installation
Configure the rails that are attached to the switch.
1 Attach the switch rails (inner chassis members) to the S6000-ON switch.
Figure
4-5, item 3 shows the detail for the front standoff with the locking tab.
18
Installation

Advertisement

Table of Contents
loading

Table of Contents